In the Space Station Processing Facility, an overhead crane is placed into position to lift the Integrated Truss Structure Z1, part of the backbone of the International Space Station. The truss, which is being moved to a payload canister for transport to Launch Pad 39A, is part of the payload on mission STS-92 scheduled to lift off Oct. 5, 2000