In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, an overhead crane lifts the Integrated Cargo Carrier-VLD (Vertical Light Deployment), part of the payload for the STS-127 mission. The ICC-VLD is being transferred to the payload canister, seen at left. The canister will deliver the ICC-VLD and other elements to Launch Pad 39A for installation in space shuttle Endeavour's payload bay. Launch is targeted for June 13. Photo credit: NASA/Troy Cryder