Loading

An overhead crane moves the Port 3/4 truss segment to the waiting payload canister for installation in the orbiter Atlantis.

NASA

NASA
Washington, DC, United States

In the Space Station Processing Facility, an overhead crane moves the Port 3/4 truss segment across the floor to the waiting payload canister for installation in the orbiter Atlantis. The truss is slated for launch on mission STS-115 no earlier than Aug. 28. The truss is the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet on the station. The P3/P4 truss, with its two large solar arrays, will provide one-fourth of the total power-generation capability of the completed station. The P3/P4 truss is expected to be loaded into Atlantis's cargo bay around the beginning of August. Photo credit: NASA/Troy Cryder

Show lessRead more
  • Title: An overhead crane moves the Port 3/4 truss segment to the waiting payload canister for installation in the orbiter Atlantis.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites