Loading

Prepressed concrete for the beam's installation building and tunnel ISR plus effects of the water that rain brought on the scenary

1968

CERN

CERN
Geneva, Switzerland

The new concrete shielding roof (images 139-142.9.68) which was built over the top of the existing PS tunnel over the target zone from which beams were taken to the North and South experimental halls (see CERN COURIER vol. 8, page 178). This precaution was done to prepare for the radiation levels which had been generated as the intensity of the proton synchrotron had been increased.

Show lessRead more
  • Title: Prepressed concrete for the beam's installation building and tunnel ISR plus effects of the water that rain brought on the scenary
  • Creator: CERN PhotoLab
  • Date Created: 1968-09, 1968
  • Contributor: GenevaCERN1968-9
  • Medium: Film, Photographic negative
  • Link to Internal Document: http://cds.cern.ch/record/1479781
  • Internal Reference: Rubrique: Date Planche:9 68 De:139 A:197
  • Comment: Album with images scanned from original photo negatives