Loading

Discovery begins its move from Orbiter Processing Facility 3 to the Vehicle Assembly Building was at 7:22 a.m. EDT.

NASA

NASA
Washington, DC, United States

Space shuttle Discovery begins its move from Orbiter Processing Facility 3 to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out of its hangar was at 7:22 a.m. EDT. In the VAB, Discovery will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform. The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station. Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay. Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett

Details

  • Title: Discovery begins its move from Orbiter Processing Facility 3 to the Vehicle Assembly Building was at 7:22 a.m. EDT.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Flash this QR Code to get the app
Google apps