In its vertical position, external tank No. 125 is being lifted high into the upper levels of the Vehicle Assembly Building for transfer to a checkout cell in high bay 4 to allow for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder