Loading

In the Orbiter Processing Facility bay 3 technicians on the Hyster forklift maneuver main engine No. 3 in Discovery.

NASA

NASA
Washington, DC, United States

In the Orbiter Processing Facility bay 3, technicians on the Hyster forklift maneuver main engine No. 3 into place in Discovery. The main engine configuration is manufactured by Pratt & Whitney Rocketdyne in Canoga Park, Calif., and includes a Pratt & Whitney high-pressure fuel turbo pump. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end of the nozzle. Discovery is being processed for its next mission, STS-116 (12A.1), to deliver a third truss segment, a SPACEHAB module and other key components to the International Space Station. The launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/Kim Shiflett

Details

  • Title: In the Orbiter Processing Facility bay 3 technicians on the Hyster forklift maneuver main engine No. 3 in Discovery.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Flash this QR Code to get the app
Google apps