In the Space Station Processing Facility, the overhead crane lowers the S5 integrated truss toward the payload canister. The external stowage platform 3 (ESP3) is already in the canister, at left. Endeavour is targeted for launch on Aug. 9 to the International Space Station. The mission will continue space station construction by delivering the third starboard truss segment, as well as carrying the ESP3 and the SPACEHAB module. Photo credit: NASA/Dimitri Gerondidakis