Loading

LO2/TSMU Lift and Installation

NASA/Kim Shiflett2018-07-12

NASA

NASA
Washington, DC, United States

A crane is used to lower the first of two Tail Service Mast Umbilicals for installation on the 0-level deck of the mobile launcher on July 12, at NASA's Kennedy Space Center in Florida. The 35-foot-tall umbilical will connect to NASA's Space Launch System rocket core stage aft section and provide liquid oxygen and electrical cable connections to the core stage engine section to support propellant handling during prelaunch operations. The installation brings Exploration Ground Systems one step closer to supporting prelaunch operations for the agency's SLS rocket and Orion spacecraft on Exploration Mission-1 and deep space destinations.

Show lessRead more
  • Title: LO2/TSMU Lift and Installation
  • Creator: NASA/Kim Shiflett
  • Date Created: 2018-07-12
  • Location: Mobile Launcher
  • Rights: KSC
  • Album: ajwatso3
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites