Loading

Outside the Vehicle Assembly Building are on hand to watch space shuttle Discovery roll out to Launch Pad 39A.

NASA

NASA
Washington, DC, United States

Outside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, Kennedy employees, and their families and friends, are on hand to watch space shuttle Discovery roll out to Launch Pad 39A. It will take the shuttle, attached to its external fuel tank, twin solid rocket boosters and mobile launcher platform, about seven hours to complete the move atop a crawler-transporter. This is the second time Discovery has rolled out to the pad for the STS-133 mission, and comes after a thorough check and modifications to the shuttle's external tank.


Targeted to liftoff Feb. 24, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett

Details

  • Title: Outside the Vehicle Assembly Building are on hand to watch space shuttle Discovery roll out to Launch Pad 39A.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Flash this QR Code to get the app
Google apps