Loading

Plastimont T architect’s construction kit

Robert Lenz, Säckingen am Rhein1950/1959

Deutsches Museum

Deutsches Museum

In the 1950s, planners and industry began rationalizing and introducing new standards for construction. New modular methods of construction were developed that are still standard today: In this style of construction, large structural members are prefabricated and then assembled on the construction site. Architect Robert Lenz created a construction kit consisting of prefabricated parts which could be assembled to build different types of buildings, just like on the actual construction site: An exemplary modern construction kit of which only a few were produced.

Show lessRead more
  • Title: Plastimont T architect’s construction kit
  • Creator: Robert Lenz, Säckingen am Rhein
  • Date: 1950/1959
Home
Explore
Nearby
Profile