Loading

Space shuttle Atlantis comes to a stop on the top after more than a journey from the Vehicle Assembly Building.

NASA

NASA
Washington, DC, United States

Space shuttle Atlantis comes to a stop on the top of Launch Pad 39A at NASA's Kennedy Space Center after more than a 6-hour journey from the Vehicle Assembly Building. First motion occurred at 9:19 a.m. EDT and Atlantis was hard down on the pad at 3:52 p.m. At far left is the rotating service structure that will be rotated to enclose the shuttle for launch preparations. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett

Show lessRead more
  • Title: Space shuttle Atlantis comes to a stop on the top after more than a journey from the Vehicle Assembly Building.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites