Loading

Space shuttle Endeavour approaches the Vehicle Assembly Building on its transfer from Orbiter Processing Facility-2.

NASA

NASA
Washington, DC, United States

At NASA's Kennedy Space Center in Florida, space shuttle Endeavour approaches the Vehicle Assembly Building on its transfer from Orbiter Processing Facility-2.

The rollover began at 12:53 a.m. EST and was completed at 2:08 p.m. when Endeavour was towed into the VAB's transfer aisle. Next, Endeavour will be attached to a lifting sling, hoisted over a transom and lowered into High Bay 1, where it will be attached to its external fuel tank and solid rocket boosters. Rollout of the shuttle stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for early January 2010. The Italian-built Tranquility module, the primary payload for Endeavour's STS-130 mission, will be installed in the payload bay after the shuttle arrives at the pad. Launch is targeted for early February. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Dimitri Gerondidakis

Show lessRead more
  • Title: Space shuttle Endeavour approaches the Vehicle Assembly Building on its transfer from Orbiter Processing Facility-2.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites