Loading

The crew of mission STS-115 has arrived at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch to the International Space Station.

NASA

NASA
Washington, DC, United States

The crew of mission STS-115 has arrived at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch on Aug. 27 to the International Space Station. They talk to the media before heading to crew quarters in the Operations and Checkout Building. At the microphone is Mission Specialist Joseph Tanner. On the left is Commander Brent Jett; on the right is Pilot Christopher Ferguson. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett

Show lessRead more
  • Title: The crew of mission STS-115 has arrived at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch to the International Space Station.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description

Recommended

Home
Explore
Nearby
Profile