Loading

The first SSME fully assembled at KSC onto an engine stand with the assistance of other technicians.

NASA

NASA
Washington, DC, United States

In the Space Shuttle Main Engine (SSME) Processing Facility, Boeing-Rocketdyne crane operator Joe Ferrante (left) lowers SSME 2058, the first SSME fully assembled at KSC, onto an engine stand with the assistance of other technicians on his team. The engine is being moved from its vertical work stand into a horizontal position in preparation for shipment to NASA’s Stennis Space Center in Mississippi to undergo a hot fire acceptance test. It is the first of five engines to be fully assembled on site to reach the desired number of 15 engines ready for launch at any given time in the Space Shuttle program. A Space Shuttle has three reusable main engines. Each is 14 feet long, weighs about 7,800 pounds, is seven-and-a-half feet in diameter at the end of its nozzle, and generates almost 400,000 pounds of thrust. Historically, SSMEs were assembled in Canoga Park, Calif., with post-flight inspections performed at KSC. Both functions were consolidated in February 2002. The Rocketdyne Propulsion and Power division of The Boeing Co. manufactures the engines for NASA.

Details

  • Title: The first SSME fully assembled at KSC onto an engine stand with the assistance of other technicians.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Flash this QR Code to get the app

Interested in Science?

Get updates with your personalized Culture Weekly

You are all set!

Your first Culture Weekly will arrive this week.

Google apps