Loading

The orbiter Atlantis is ready to roll out of the Orbiter Processing Facility to make the short trip to the Vehicle Assembly Building.

NASA

NASA
Washington, DC, United States

The orbiter Atlantis is ready to roll out of the Orbiter Processing Facility to make the short trip to the Vehicle Assembly Building. First motion was at 6:19 a.m. EST. Once in the VAB, Atlantis will be lifted into high bay 1 and mated with the external tank and solid rocket boosters already in place on the mobile launcher platform. The rollover signals the start of the journey to the launch pad for liftoff on mission STS-117 targeted for March 15. The mission is the 21st to the International Space Station and will deliver the S3/S4 starboard truss segments. Photo credit: NASA/Kim Shiflett

Show lessRead more
  • Title: The orbiter Atlantis is ready to roll out of the Orbiter Processing Facility to make the short trip to the Vehicle Assembly Building.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites