Loading

The Space Shuttle's lightweight external tank is lifted in KSC's Vehicle Assembly Building for STS-91 pre-flight processing.

NASA

NASA
Washington, DC, United States

The Space Shuttle's first super lightweight external tank is lifted in KSC's Vehicle Assembly Building for STS-91 pre-flight processing. STS-91 is targeted for launch in late May. The improved tank is 7,500 pounds lighter than its predecessors and was developed to increase the Shuttle payload capacity on International Space Station assembly flights. Major changes to the lighter tank include the use of new materials and a revised internal design. The new liquid oxygen and liquid hydrogen tanks are constructed of aluminum lithium a lighter, stronger material than the metal alloy currently used. The redesigned walls of the liquid hydrogen tank were machined to provide additional strength and stability as well

Show lessRead more
  • Title: The Space Shuttle's lightweight external tank is lifted in KSC's Vehicle Assembly Building for STS-91 pre-flight processing.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites