The STS-118 payload canister transporter exits the Space Station Processing Facility with a full load. Inside are the SPACEHAB module, the S5 truss and the external stowage platform 3. The canister is being moved to the Canister Rotation Facility where it will be raised to a vertical position for delivery to Launch Pad 39A. Endeavour is targeted for launch on Aug. 9 to the International Space Station. The mission will continue space station construction with installation of the truss. Photo credit: NASA/Jim Grossmann