Waterproofing before tiling. In the middle, the rough concrete volumes create a maze on the terraces. In the background one can see the tiers of one of the open air amphitheaters. The eastern part of the domain is being used as a work site before the rest of the buildings are raised on the entire width of the hill.
Details