Workers keep check on the closing payload bay doors on Space Shuttle Discovery. Inside are the two elements to be added to the International Space Station on mission STS-92. At top is the third Pressurized Mating Adapter; below it is Integrated Truss Structure Z-1, the cornerstone truss of the Station. Making the 100th Space Shuttle mission launched from Kennedy Space Center, Discovery also will be making its 28th flight into space. On the 11-day mission, the crew of seven will be making four space walks to attach the hardware to the Station