Loading

Space Shuttle Endeavour is and ready for prelaunch processing after a nearly 7 hour trip from the Vehicle Assembly Building.

NASA

NASA
Washington, DC, United States

Space Shuttle Endeavour is on Launch Pad 39A and ready for prelaunch processing after a nearly 7-hour trip from the Vehicle Assembly Building. First motion out of the VAB was at 8:10 p.m. July 10, and the shuttle was hard down on the pad at 3:02 a.m. July 11. At far left is the rotating service structure, called the RSS, which can be rolled around to enclose the shuttle for access during processing. Between the RSS and the shuttle is the fixed service structure, topped by an 80-foot-tall lightning mast. Endeavour is scheduled to launch on mission STS-118 on Aug. 7. During the mission, Endeavour will carry into orbit the S5 truss, SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and will mark the first flight of Mission Specialist Barbara Morgan, the teacher-turned-astronaut whose association with NASA began more than 20 years ago. STS-118 will be the first flight since 2002 for Endeavour, which has undergone extensive modifications, including the addition of safety upgrades already added to orbiters Discovery and Atlantis. Photo credit: NASA/Ken Thornsley

Show lessRead more
  • Title: Space Shuttle Endeavour is and ready for prelaunch processing after a nearly 7 hour trip from the Vehicle Assembly Building.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Interested in Science?

Get updates with your personalized Culture Weekly

You are all set!

Your first Culture Weekly will arrive this week.

Home
Discover
Play
Nearby
Favorites