In the foreground the concrete slab of the terrace of building 5 is being poured. Behind one can see the work site for the elements of the maze, and an interior wall of building 4 with the counter relief indicating the level of the future terraces. In the back the old Villa is being renovated. The picture is taken from the top of the mastaba.