View of dam from downstream side of Duero River (forms border between Spain and Portugal). Note entrance to underground power house, (tunnel). Iberduero Power Co. Aldeadavila Station, Spain. Largest hydro station in Europe, contains 6 General Electric hydraulic-driven generators rated: ATI-W-32 poles, 187.5 RPM, 13,800 volts, 142,500 KVA requisition 247-281-650790 DTD 7/14/58. Installation completed 12/63.
Title: View of dam from downstream side of Duero River (forms border between Spain and Portugal). Note entrance to underground power house, (tunnel). Iberduero Power Co. Aldeadavila Station, Spain. Largest hydro station in Europe, contains 6 General Electric hydraulic-driven generators rated: ATI-W-32 poles, 187.5 RPM, 13,800 volts, 142,500 KVA requisition 247-281-650790 DTD 7/14/58. Installation completed 12/63.
Creator: General Electric Company
Date Created: 1964-03-03
Location: Spain
Physical Dimensions: 8 x 10
Original Language: English
Subject Keywords: Dams; Hydroelectric power; Power plants; GE Energy (Firm);
Rights: This digital image may be used for educational uses. Please cite as miSci- Museum of Innovation & Science. Prior written permission is required for any other use of the images from miSci.
Get the app
Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more