Installation of the chamber body of the 3.7 m hydrogen bubble chamber, BEBC, in its vacuum tank just before Christmas. The body, equipped with its heat exchangers and two fish-eyes which were used in the first series of tests, was being lowered through the top of the shielding which surrounded the chamber.