Loading

A space shuttle main engine is moved from the Space Shuttle Main Engine Processing Facility to Orbiter Processing Facility Bay 3.

NASA

NASA
Washington, DC, United States

At NASA's Kennedy Space Center in Florida, a space shuttle main engine is moved from the Space Shuttle Main Engine Processing Facility to Orbiter Processing Facility Bay 3 next door. There, it will be installed in space shuttle Discovery during processing for the shuttle's STS-131 mission to the International Space Station.

The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with resupply stowage platforms and racks to be transferred to locations around the station. Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. Discovery's launch, targeted for March 18, 2010, will initiate the 33rd shuttle mission to the station. For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html. Photo credit: NASA/Jim Grossmann

Show lessRead more
  • Title: A space shuttle main engine is moved from the Space Shuttle Main Engine Processing Facility to Orbiter Processing Facility Bay 3.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites