In the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane lifts the Experiment Logistics Module Pressurized Section, or ELM-PS, of the Japanese Experiment Module, called Kibo, from its workstand. The module will be placed in a payload canister for eventual transfer to Launch Pad 39A. The ELM-PS is the primary payload for space shuttle Endeavour's STS-123 mission, which is targeted for launch to the International Space Station on March 11. Photo credit: NASA/George Shelton, Troy Cryder