Loading

Assembly on test stand of (170X182) TVA-No. 2 Paradise, low-pressure unit - with partial assembly of upper and lower half fabricated exhaust hoods. Unit shown (code TB. ME) is 1800-RPM, low-pressure, 565,000-KW, steam turbine; part of 1,130,000-KW, 3600/1800-RPM, cross-compound, steam turbine-generator unit, being built for TVA Paradise Station. (Slide No. 38-C-469).

General Electric Company1967-01-26

Museum of Innovation & Science

Museum of Innovation & Science
Schenectady, United States

  • Title: Assembly on test stand of (170X182) TVA-No. 2 Paradise, low-pressure unit - with partial assembly of upper and lower half fabricated exhaust hoods. Unit shown (code TB. ME) is 1800-RPM, low-pressure, 565,000-KW, steam turbine; part of 1,130,000-KW, 3600/1800-RPM, cross-compound, steam turbine-generator unit, being built for TVA Paradise Station. (Slide No. 38-C-469).
  • Creator: General Electric Company
  • Date Created: 1967-01-26
  • Location: Schenectady - Schenectady County - New York
  • Physical Dimensions: 8 x 10
  • Original Language: English
  • Subject Keywords: Electric generators; Engines; Employees; Factories; Tennessee Valley Authority; GE Energy (Firm);
  • Type: Photograph
  • Publisher: General Electric Company
  • Rights: This digital image may be used for educational uses. Please cite as miSci- Museum of Innovation & Science. Prior written permission is required for any other use of the images from miSci.
Museum of Innovation & Science

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites