At lower left, in the Space Station Processing Facility, the Spacehab module is prepared for its move to the payload canister at right. The module is part of the payload on mission STS-118 and will be loaded into Space Shuttle Endeavour's payload bay at the pad. Endeavour is targeted for launch on Aug. 9 to the International Space Station. The mission will continue space station construction by delivering a third starboard truss segment, S5, as well as carrying the external stowage platform 3 and Spacehab module. Photo credit: NASA/Jim Grossmann