Loading

Atlantis rolls out to Launch Pad 39A at NASA's Kennedy Space Center after rollout from the Vehicle Assembly Building.

NASA

NASA
Washington, DC, United States

In the early morning hours, space shuttle Atlantis rolls out to Launch Pad 39A at NASA's Kennedy Space Center in Florida after rollout from the Vehicle Assembly Building. The shuttle sits atop the mobile launcher platform, which is carried by the crawler-transporter beneath. First motion was at 3:54 a.m. EDT and Atlantis was secured on the pad at 11:17 a.m. The 3.4-mile trip took about seven-and-a-half hours. Atlantis is targeted to lift off May 12 to service NASA's Hubble Space Telescope. During Atlantis' 11-day mission, the crew of seven astronauts will make the final shuttle flight to Hubble. During five spacewalks, they will install two new instruments, repair two inactive ones and replace components. The result will be six working, complementary science instruments with capabilities beyond what is now available, and an extended operational lifespan for the telescope through at least 2014. Photo credit: NASA/Jack Pfaller

Show lessRead more
  • Title: Atlantis rolls out to Launch Pad 39A at NASA's Kennedy Space Center after rollout from the Vehicle Assembly Building.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites