Loading

Atlantis sits on Launch Pad 39A at NASA's Kennedy Space Center after rollout from the Vehicle Assembly Building.

NASA

NASA
Washington, DC, United States

Space shuttle Atlantis sits on Launch Pad 39A at NASA's Kennedy Space Center in Florida after rollout from the Vehicle Assembly Building. The shuttle sits atop the mobile launcher platform, which is carried by the crawler-transporter beneath. Beyond the shuttle on the horizon is the Atlantic Ocean. At left, behind the shuttle, is the 300,000-gallon water tower which releases water over the pad for sound suppression during liftoff. First motion was at 3:54 a.m. EDT and Atlantis was secured on the pad at 11:17 a.m. The 3.4-mile trip took about seven-and-a-half hours. Atlantis is targeted to lift off May 12 to service NASA's Hubble Space Telescope. During Atlantis' 11-day mission, the crew of seven astronauts will make the final shuttle flight to Hubble. During five spacewalks, they will install two new instruments, repair two inactive ones and replace components. The result will be six working, complementary science instruments with capabilities beyond what is now available, and an extended operational lifespan for the telescope through at least 2014. Photo credit: NASA/Jack Pfaller

Details

  • Title: Atlantis sits on Launch Pad 39A at NASA's Kennedy Space Center after rollout from the Vehicle Assembly Building.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Flash this QR Code to get the app
Google apps