Arrival at the beginning of May of sections of the huge crane-bridges for the West experimental half on the intersecting storage rings site. The total weight of one bridge is 200 tones. The sections in the protographs are the outer parts of a bridge which was connected by a central piece 20 m long of 2.8 m by 1.3 m cross-section.