The construction site was a dangerous place. The deepest foundation at the south pier, more than 30 metres below ground level, required men to work in conditions up to four times normal air pressure.
Show lessRead more
Details
Title: Bridge Inspector preparing to inspect foundation for eastern cylinder of Pier 26, Brisbane