The concrete jungle of the East experimental hall at the proton synchrotron. Only someone with a very good reason (or someone from whom all reason has departed) would start introducing changes in here. During the present PS shutdown beam-line modifications were limited to linking the m6 beam-line to the 2 m bubble chamber and to improving the feed to the hyperon beam.