The WIRTH tunnelling machine assembled and ready to be lowered to bottom of shaft PM18 before starting work on the main ring tunnel. This tunneling machine will bore the 3,76 meter diameter tunnel of LEP.
You are all set!
Your first Culture Weekly will arrive this week.