In the Vehicle Assembly Building at NASA's Kennedy Space Center, the suspended external tank is moved into high bay 1. The tank will be lowered toward the mobile launcher platform for mating with the solid rocket boosters, or SRBs, already installed on the platform. Work to remove and replace the feed-through connector on the external tank will be done in parallel with integrated ET/SRB testing in preparation for space shuttle Endeavour to join the stack later in January. The STS-123 mission is targeted for launch on Endeavour in mid-March. The 25th assembly flight to the International Space Station, Endeavour's payload includes the Japanese Experiment Logistics Module Pressurized Section. Photo credit: NASA/Kim Shiflett