This industrial building may have been an electricity substation built in the early years of the 20th century. In 1982 it was converted into a sports centre by Camden Council, but it closed in 2015 and in 2016 it was converted into flats by Studio 54 Architecture. This image was taken following its conversion to a sports centre.