Part of the installations being constructed near the Proton Synchrotron (PS) for the future neutrino experiments

1966

CERN

CERN
Geneva, Switzerland

On the right can be seen the meson decay tunnel (partially covered with earth) made of corrugated steel sheet and, in the centre, the last section of this tunnel is being constructed. This section is made of steel ingots in order to reduce neutron leakage out of the tunnel.

Show lessRead more
  • Title: Part of the installations being constructed near the Proton Synchrotron (PS) for the future neutrino experiments
  • Creator: CERN PhotoLab
  • Date Created: 1966-04, 1966
  • Contributor: GenevaCERN1966-4
  • Medium: Film, Photographic negative
  • Link to Internal Document: http://cds.cern.ch/record/1728795
  • Internal Reference: Rubrique: Date Planche:4 66 De:114 A:116