Detailed cut of the inside of the roof on the third floor before the restoration of Pinson Hall in 2019. The wooden structure of the ceiling that was exposed as asbestos was removed reveals the original form of history and creates a poetic space.
You are all set!
Your first Culture Weekly will arrive this week.