Loading

Space Shuttle Columbia rolls over from Orbiter Processing Facility bay 1 to the Vehicle Assembly Building to be mated to its rocket booster stack.

NASA

NASA
Washington, DC, United States

Space Shuttle Columbia rolls over from Orbiter Processing Facility bay 1 to the Vehicle Assembly Building to be mated to its external tank/solid rocket booster stack. Roll out to Pad 39A in preparation for mission STS-83 is set for first motion at 7 a.m. on Tuesday. Launch is currently targeted for April 3 at 2:01 p.m. EST

Details

  • Title: Space Shuttle Columbia rolls over from Orbiter Processing Facility bay 1 to the Vehicle Assembly Building to be mated to its rocket booster stack.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Flash this QR Code to get the app

Interested in Science?

Get updates with your personalized Culture Weekly

You are all set!

Your first Culture Weekly will arrive this week.

Google apps