In 12th June 2010 the vault of the altar collapse and till the 30th July, with the help of a construction company (Cella Cosimex), it was built a protection structure to cover the church. The students of the art University, leader by proof. dr. Dan Mohanu, consolidated the exterior painting. The roof and the vault of the altar was disassembled and stored in a temporary building made near the church. In 2011 the National Chamber of Architects and Pro Patrimonio Foundation organized several events for fundraising to start the restoration works for the church. In the same time the team of the architects how draw the project has continue the procedures to obtain the permit for the restoration. The final approval was obtain in the 9th of October 2012. With the fund raised in 2011 and help from the Headley Trust UK, in 2012 is finalized the painting consolidation, disassembled the main vault and transported in Bucharest at the Art University to be restored.