Loading

The gaseous nitrogen tank has been removed from Discovery's payload bay during processing for the shuttle's mission to the International Space Station.

NASA

NASA
Washington, DC, United States

In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, the gaseous nitrogen tank has been removed from space shuttle Discovery's payload bay during processing for the shuttle's STS-131 mission to the International Space Station.

The tanks are used for atmosphere conditioning and for moving potable water in the crew module. The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with science racks to be transferred to laboratories on the station. Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. This will be the 33rd shuttle mission to the station. Launch is targeted for March 18, 2010. Photo credit: NASA/Troy Cryder

Show lessRead more
  • Title: The gaseous nitrogen tank has been removed from Discovery's payload bay during processing for the shuttle's mission to the International Space Station.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites