Loading

The high bay crane suspends space shuttle Discovery ready to lift the shuttle into the upper levels and lower into High Bay 1.

NASA

NASA
Washington, DC, United States

In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 250-ton high bay crane suspends space shuttle Discovery above the transfer aisle, ready to lift the shuttle into the upper levels and lower it into High Bay 1. Visible on Discovery's underside are the umbilical areas, the external fuel tank attach points. In High Bay 1, Discovery will be attached to the external tank and solid rocket boosters already stacked on the mobile launcher platform. Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station. The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay. Launch of Discovery is targeted for late August. Photo credit: NASA/Ben Smegelsky

Show lessRead more
  • Title: The high bay crane suspends space shuttle Discovery ready to lift the shuttle into the upper levels and lower into High Bay 1.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites