Loading

The orbiter Atlantis is lowered on top of the Mobile Launcher Platform for mating before rollout to the launch pad for mission STS-112.

NASA

NASA
Washington, DC, United States

Suspended from an overhead crane, the orbiter Atlantis is lowered toward the solid rocket booster and external tank below, on top of the Mobile Launcher Platform, for mating before rollout to the launch pad for mission STS-112. Launch is scheduled no earlier than Oct. 2 for the 15th assembly flight to the International Space Station. Atlantis will carry the S1 Integrated Truss Structure, which will be attached to the central truss segment, the S0 truss, during the mission.

Show lessRead more
  • Title: The orbiter Atlantis is lowered on top of the Mobile Launcher Platform for mating before rollout to the launch pad for mission STS-112.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites