The orbiter Endeavour hangs suspended from a crane inside the Vehicle Assembly Building. Endeavour will be lifted into high bay 1 and stacked with its external tank and solid rocket boosters. Space Shuttle Endeavour is scheduled to be launched Nov. 30 on mission STS-97, the sixth construction flight to the International Space Station