Celebrating 15!
Loading

The P6 integrated truss segment passes over the two Multi-Purpose Logistics Modules Leonardo and Raffaello behind Leonardo.

NASA

NASA
Washington, DC, United States

As it travels across the Space Station Processing Facility, the P6 integrated truss segment passes over the two Italian-built Multi-Purpose Logistics Modules, Leonardo (right) and Raffaello (behind Leonardo). The P6 is being moved to a payload transport canister for transfer to Launch Pad 39B. There it will be placed in Endeavour’s payload bay for launch on mission STS-97. The P6 comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to be installed on the Space Station. The Station’s electrical power system will use eight photovoltaic solar arrays, each 112 feet long by 39 feet wide, to convert sunlight to electricity. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station. Launch is scheduled Nov. 30 at 10:06 p.m. EST

Show lessRead more
  • Title: The P6 integrated truss segment passes over the two Multi-Purpose Logistics Modules Leonardo and Raffaello behind Leonardo.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Interested in Science?

Get updates with your personalized Culture Weekly

You are all set!

Your first Culture Weekly will arrive this week.

Home
Discover
Play
Nearby
Favorites