The newly arrived S5 truss segment for the International Space Station passes near the Vehicle Assembly Building on its trek to the Space Station Processing Facility. There it will be fit checked for a Photo-Voltaic Radiator Grapple Fixture. It will also undergo a fit check to a truss simulator to ensure that it will fit properly with the S4 and S6 truss segments. S5 is scheduled for launch in October 2003 on mission STS-118. It will be the tenth truss assembled in an 11-truss structure.