This aerial view of the Vehicle Assembly Building captures vehicles on both pads at Launch Complex 39. Space shuttle Atlantis awaits liftoff from Pad 39A, at right, while processing of the Ares I-X rocket is almost finished on Pad 39B, at left. The Ares I-X flight test is set for Oct. 27; space shuttle Atlantis' STS-129 launch to the International Space Station is targeted for Nov. 16. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. For information on the STS-129 mission and crew, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Kim Shiflett