More than 40 freezer tubes 65 m long are being used for the sinking of one of the LEP shafts at point 8. Four compressors with a total power of 800,000 kcal/h are required to create this enormous tubular underground ice-lolly.
Afficher moinsEn savoir plus
Détails
Titre: Prises de vue du chantier LEP
Créateur: CERN PhotoLab
Date de création: 1984-02, 1984
Contributeur: GenevaCERN1984-2
Support: Film, Photographic negative
Link to Internal Document: http://cds.cern.ch/record/1721085
Comment: Album with images scanned from original photo negatives
Internal Reference: Rubrique: Date Planche:2 84 De:229 A:312