Loading

Workers in Payload Changeout Room prepare the Integrated Truss Structure Z1 for transfer to the payload bay of Discovery.

NASA

NASA
Washington, DC, United States

Workers in Payload Changeout Room at Launch Pad 39A prepare the Integrated Truss Structure Z1 for transfer to the payload bay of Discovery. The Z1 is the first of 10 trusses to be installed on the International Space Station. The truss will allow the first U.S. solar arrays on flight 4A, scheduled for Nov. 30, to be temporarily installed on Unity for early power. Space Shuttle Discovery is scheduled for launch on Oct. 5 at 9:38 p.m. EDT. It will be the 100th flight in the Shuttle program

Show lessRead more
  • Title: Workers in Payload Changeout Room prepare the Integrated Truss Structure Z1 for transfer to the payload bay of Discovery.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites