Loading

Workers in the Space Station Processing Facility make final preparations for closing the access hatch to the Unity connecting module.

NASA

NASA
Washington, DC, United States

Workers in the Space Station Processing Facility make final preparations for closing the access hatch to the Unity connecting module, part of the International Space Station, before its launch aboard Space Shuttle Endeavour on STS-88 in December. Unity will now undergo a series of leak checks before a final purge of clean, dry air inside the module to ready it for initial operations in space. Other testing includes the common berthing mechanism to which other space station elements will dock and the Pad Demonstration Test to verify the compatibility of the module with the Space Shuttle as well as the ability of the astronauts to send and receive commands to Unity from the flight deck of the orbiter. The next time the hatch will be opened it will be by astronauts on orbit. Unity is expected to be ready for installation into the payload canister on Oct. 25, and transported to Launch Pad 39-A on Oct. 27. The Unity will be mated to the Russian-built Zarya control module which should already be in orbit at that time

Show lessRead more
  • Title: Workers in the Space Station Processing Facility make final preparations for closing the access hatch to the Unity connecting module.
  • Location: Kennedy Space Center, FL
  • Owner: KSC
  • Album: cbabir
  • About Title: To help you find images you’re searching for, previously untitled images have been labelled automatically based on their description
NASA

Get the app

Explore museums and play with Art Transfer, Pocket Galleries, Art Selfie, and more

Home
Discover
Play
Nearby
Favorites